Product Description
Main Features:
1.UV resistance
2. Anti-seepage;
3. Isolation
4. High tearing resistance
5. Puncture-resisting
Product Parameters
Product name |
HDPE geomembrane |
Thickness |
0.2 mm-2.0 mm |
Width |
1m-8m |
Color |
Black, white, green, blue |
Quality standards |
Factory Standard, national standard, urban construction, n standard |
MOQ |
1000 square meters |
Packaging |
Woven Bag |
Transport |
Lots of shipping, samples by air |
HDPE Geomembrane Application:
(1)Aquaculture:
Using the geomembrane anti-seepage feature; geomembrane liners can be used as fish ponds, shrimp pond, tank liner and others.
(2)Landfill:
HDPE geomembrane is the most widely used in landfill anti-seepage engineering material. The use of main parts of the bottom of the landfill liner, landfill sealing cover, leachate regulating pool liner, etc.
(3)Water Treatment System :
HDPE geomembrane is applied to the adjustment of the power plant and sewage treatment plants pool;and a series of water treatment systems.
(4)Mining:
HDPE geomembrane suitable mining: washing pool, pool heap leaching, heap yard, dissolving tank, tank, storage area, the bottom line of the tailings seepage control, etc
HDPE membrane construction solution:
1. Geomembrane construction technology
Laying, cutting → aligning, aligning → laminating and shaping → wiping dust → welding test → welding → testing → repairing → re-inspection → acceptance
2. Technical points
(1) Minimize the amount of splicing when laying, so as to achieve a satisfactory anti-seepage effect under unfavorable conditions.
(2) When laying geomembrane, it should start from the lowest position and extend to the high position. Don't pull too tight, and leave enough margin (about 1.5%) to prepare for local sinking and stretching.
(3) When laying the slope, according to the actual situation of the project, it can be determined to be laid parallel or perpendicular to the maximum slope line based on the principle of least joints, easy construction, and reasonable cutting. Seams should be avoided
Open corners, set at the plane. Where the slope is relatively large, a soft ladder is set up, and the construction personnel carry out the welding joint construction of the geomembrane on the soft ladder.
(4) During the laying process, welds, especially cross welds, should be minimized to reduce leakage hazards. During the film unfolding process, it is forbidden to pull the geomembrane forcefully, and it is not allowed to press out the dead fold. When the weld is welded, the floating soil on it must be wiped clean, otherwise the upper and lower membranes cannot be heat-sealed together. To connect with the building foundation, the geomembrane must be flattened and not folded, so as to provide good operating conditions for edge sealing.
(5) According to the design direction of film laying, use a heat welding machine to weld. Before the formal welding, test welding is carried out first, and then large-area welding construction is carried out. When welding, prevent the welding machine from being blocked and leaking the geomembrane and affecting the welding speed and quality.
(6) The lap width should meet the design requirements, and the double-pass welding seam method is adopted to provide multiple protections, and the welding effect can be tested by inflating between the welding layers. After welding, the welding quality of the weld should be checked in time.
(7) When T-shaped seams and double T-shaped seams appear, the base material is used to fill the scar, and the corners of the scar are rounded. The seam of the geomembrane is the key to construction quality control, and it should be strictly monitored during welding. The expansion or contraction of the geomembrane affected by the temperature will cause difficulties in splicing. Adjust the temperature and speed to prevent the seam from bending, overlapping, weak welding or ironing through the seam.
Product Process
Customisation
We can customize different sizes as your require.For example length and width.
Packaging & Shipping
Good Comment
Company Profile
Cooperation
Certifications
FAQ
Q:Are you a manufacturing factory or a trading company?
A:We are a production factory and have our own foreign trade department.
Q: Where is your factory? May I Visit Your Factory?
A: Dezhou Yurun Geotextile Co. , Ltd. is located in Luxi, Wuyou Street, Ling County Economic Development Zone, Dezhou City, Shandong province, China. You are welcome to visit our factory anytime.
Q:What's your minimum order size?
A: Our minimum order is 1000 square meters.
Q: How Long is your production period?
A: Our production time is 7-15 days.
Q: What is your production capacity?
A: We have 8 large production workshops, 18 production lines, daily production of 60,000 square meters.
Q: What are your terms of payment?
A: T/T , L/C,D/P etc
Q: OEM OR ODM accepted?
A: We can produce the geomembrane with our brand as per customer's technical requirements
Contact person:Jiang Yanhong