Customization: | Available |
---|---|
After-sales Service: | 100% |
Warranty: | 3-5 Year |
Still deciding? Get samples of US$ 40/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Material | Polyester |
Weight | 110-800 grams |
Width | 1-6 m |
Color | White |
Standards | National standards |
Apply to | Highway, slope protection, embankment, isolation, maintenance, etc. |
Packaging | Plastic wrap or woven bag |
MOQ | 1000 square meters |
Here are several functions for geotextile:
We support customize as require.
How to install geotextile fabric
Let us show you how easy the installation is and provide a few useful tips along the way. In our example,
Step 1 - Prep the road surface
First, you will need to excavate the roadway to the desired elevation. Then fully compact your subgrade, making sure you have removed all air and tightened the soil completely.
Step 2 - Unroll the reinforcement geotextile fabric
Roll the geotextile fabric on the compacted subgrade, making sure it's free of wrinkles and folds. Overlap your fabric as directed by the engineer. Cherokee can pre-sew the fabric for you if a stitch seam is required. Contact your Cherokee representative to get pricing on factory seamed rolls in a wider widths.
Step 3 - Repair the geotextile fabric
This job required the fabric to be stitched on the job site. The fabric needs to be seamed with a dual thread lock stitch to prevent it from unthreading. We have equipment available for purchase or rental to do the stitching on the job. At the engineers discretion you can choose a prayer seam, j-seam, or butterfly seam. In this example we will be using a j-seam. We recommend doing two stitches on each seam to prevent any failure during installation.
Step 4 - Apply Aggregate
Place your aggregate to the specified thickness, ensuring that no equipment drives directly on the engineered fill. Make sure the fill has reached full compaction before the final step.
Step 5 - Lay Asphalt
Now that you have placed your subbase you are ready for your pavement layer (or layers depending on the project type).
FAQ
Q:Are you a manufacturing factory or a trading company?
A:We are a production factory and have our own foreign trade department.
Q: Where is your factory? May I Visit Your Factory?
A: Dezhou Yurun Geotextile Co. , Ltd. is located in Luxi, Wuyou Street, Ling County Economic Development Zone, Dezhou City, Shandong province, China. You are welcome to visit our factory anytime.
Q:What's your minimum order size?
A: Our minimum order is 1000 square meters.
Q: How Long is your production period?
A: Our production time is 7-15 days.
Q: What is your production capacity?
A: We have 8 large production workshops, 18 production lines, daily production of 60,000 square meters.
Q: What are your terms of payment?
A: T/T , L/C,D/P etc
Q: OEM OR ODM accepted?
A: We can produce the geomembrane with our brand as per customer's technical requirements
Contact person:Jiang Yanhong